"If you are too proud of one successful result, you will never wait for the second" Konosuke Matsushita

Before: New facility
What was done: Supply and technical control of StoVentec Ventilated Façade System and Rockwool Insulants
Result:Upon expiry of the warranty period there were no comments and corrections under the Project for all the time. The facade looks like it was done yesterday! PS: You check it out for yourself
Before: New facility
What was done: Supply and technical control of StoVentec Ventilated Façade System and Rockwool Insulants
Result:Upon expiry of the warranty period there were no comments and corrections under the Project for all the time. The facade looks like it was done yesterday! PS: You can check it out for yourself
Before: New facility
What was done: Supply, mounting and technical control of Polish-manufactured parquet floor
Result:Upon expiry of 3 years and for all the time there were no comments and corrections under the Project. The parquet has high quality and fine appearance due to interesting architectural design!
Before: New facility
What was done: Supply, mounting and technical control of Nora Floor Covering of German manufacture
Result:Upon expiry of 4 years and for all the time there were no comments and corrections under the Project. The floor has fine appearance, without open seams due to the quality and it is also safe and comfortable for our youngest friends!
Before: New facility
What was done: Supply, mounting and technical control of Nora Floor Covering of German manufacture
Result:Upon expiry of 4 years and for all the time there were no comments and corrections under the Project. The floor has fine appearance, without open seams due to the quality and it is also safe and comfortable for our youngest friends!
Before: Old building to be reconstructed
What was done: Dismantling of old façade and installation of new wet façade StoTherm System (supply of Sto materials and Rockwool insulants)
Result:Upon expiry of 1 year and for this winter it has showed good thermal insulation of the building due to heating energy savings at the school, and nowhere the plaster was cracked, collapsed and looks like it was painted yesterday!
Before: New building
What was done: Installation of new wet façade StoTherm System (supply of Sto materials and Rockwool insulants, exercising technical control over installation)
Result:Upon expiry of 2 years and for this winter the façade has showed good thermal insulation of the building due to heating energy savings at the hospital. Nowhere the plaster was cracked, collapsed and looks like it was painted yesterday even after several serious earthquakes! The tailor-developed units and parts for facade seismic resistance have shown good results!
Before: Old building to be reconstructed with façade systems dropped out three times!
What was done: Dismantling of old façade and installation of new ventilated façade StoVentec System (supply of Sto materials and Rockwool insulation, as well as technical control over the installation)
Result:Upon expiry of 4 years, the building façade has finally fine and high quality appearance without cracks and swelling as it was three times 2-3 years before us!
Before: New facility
What was done: StoVentec System installation (supply of Sto materials and Rockwool insulants, as well as technical control over performance)
Result:The work was successfully completed on May 7th, 2020 despite the quarantine due to the Covid 19 pandemic
Before: New building
What was done: StoVentec System installation (supply of Sto materials and Rockwool insulants, as well as technical control over performance)
Result:Was completed on June 15
Before: Old building in need of renovation
What was done: Dismantling of old wooden doors in a school and delivery, installation and technical control of new fire doors, aluminum doors and stained-glass windows, entrance doors and windows from Russia and a separate supply of accessories from Italy at the request of the customer.
Result:Was completed on September 15
Before: New facility
What was done: Delivery, installation and technical control of a flat roof from Wolfin waterproofing membrane from Germany
Result:After 4 years of operation, the roof does not leak anywhere and fulfills perfectly its heat loss resistance function! It is warm and dry inside the building in all weather conditions!